Home · Accelerator library · Change Controller
IT Operations · AI accelerator

Change Controller

Change-risk scoring and CAB-ready summaries.

35–50%
Failed changes avoided
2 days → 20 min
CAB prep time
50–70%
Auto-approved changes
3–6 months
Payback period
Ch
Change Controller
ITO · No. 48 of 117
What it does

Change Controller in production

  • Scores each change for blast radius and timing
  • Drafts CAB summaries with rollback and test evidence
  • Detects collisions with freezes and overlapping changes
  • Fast-tracks low-risk standard changes automatically
  • Learns from post-implementation reviews and failed changes
  • Notifies affected service owners before deployment

45-second film: the Change Controller tile, an animated mockup and the KPI impact.

How it ships

Live in 6–9 weeks, inside your perimeter

Deployment options
On-premise (air-gapped)Private cloudManaged cloudHybrid
Integrates with
ServiceNowJira Service ManagementBMC Helix ITSMGitLabAzure DevOpsMicrosoft Teams
Technology stack
PythonGoMistral 7BPrometheusElasticsearchvLLM
Compliance & security
ISO 27001SOC 2 Type IINIST CSFGDPR
Not ready for a call?

Get the MindMap capability deck

Not ready for a walkthrough of Change Controller? The capability deck covers the platform, the accelerator library and how an engagement runs. Our team emails it within one business day.

See Change Controller running inside your environment

A 20-minute technical walkthrough, no slides. Ships in 6–9 weeks.

Book a walkthrough →Browse the library →